Expansion of MRM (Phase 3) approved. This saw the mine double its capacity from 2.5 million tonnes of ore to 5.5 million tonnes of ore per year, and double the depth of the open pit from 210 metres to 420 metres, significantly increasing the size of the waste rock dump.